| |
NEW SERVICE
Barges For Charter Within Philippine Water |
| 2,400 Tonner Barge |
4 to 5 Knots Speed |
80 Liters Per Hour Fuel Consumption |
Non Self Propelled ( Tugboat/Barge) |
| 1,400 Tonner Barge |
7 to 8 Knots Speed |
120 Liters Per Hour Fuel Consumption |
Self Propelled ( LCT) |
|
Available Areas ( Looking for Companies Interested in Mine Cooperation) |
Manganese Areas
Total Area Size: 6 x 10 Hectares = 60 hectares
Area Status : With Small Scale Mining Permit and on Some Areas on Process
Manganese Grade: 32% to 60% Mn |
|
Magnetite Iron Areas
Total Area Size: 4 x 20 Hectares = 80 hectares and Expandable
Area Status : With Small Scale Mining Permits
Fe Grade: Not Less Than 60% |
|
Hematite Iron Areas
Total Area Size: 2 x 20 Hectares = 40 hectares and Expandable
Area Status : With Small Scale Mining Permits
Fe Grade: Not Less Than 60% |
|
Chromite Areas ( Ore and Fine)
Total Area Size: 4 x 20 Hectares = 80 hectares
Area Status : With Small Scale Mining Permits
Cr2O3 Grade: LOw and High Grade Chromite Ore ( above 44%)
Copper Area/Molybdenum Areas
Total Area Size: 5 x 20 Hectares = 100 hectares
Area Status : With Small Scale Mining Permits
Cu Grade: LOw and High Grade Copper
Dolomitic Limestone Area
Total Area Size: 1500 hectares
Area Status: Under Claim
Dolomite Grade: not less than 18% magnesia
Calcium: more than 30%
Silica Area
Total Area Size: 100 Hectares
Area Status: under claim
Silica Grade: above 98% SiO2 content(granulated sand), above 99%(washed granulated sand)
Silica Area 2
Total Area Size: 749 Hectares
Area Status: With Lease Agreement/Mine Operation Permit
Silica Grade: above 97% SiO2 content(fine sand), Above 97% SiO2 content(quartz rock)
|
Services Needed |
| Hauling Services( Dumptrucks) and Excavator with Breaker |